Case Study
Pablo Picasso
Details
5 Floors
Pablo-Picasso-Straße 45
13057 Berlin



Where we jumped in
We helped manage this project from the detailed design phase through to completion, with all defects resolved.
Challenges
This project was a real challenge as COVID caused delays in the supply chain. But through teamwork we were able to complete the project in 2021 as planned.
Added Value
By working closely with the general contractor and the client, we were able to avoid VOB letters for delays and additional costs, despite the logistical challenges caused by COVID.
Client: Shurgard
Type: Self-Storage
Started: November 2020
Completed: November 2021
Project Type: New Build
Role: Project Management
Mastered Challenges
- COVID
- Contaminated soil
- Demolition
Other Projects
INDUSTRIAL
Laim
For Shurgard Self-Storage
INDUSTRIAL
Berlin
For Shurgard Self Storage
RESIDENTIAL
Munich
For Ten Brinke Group
Contact us to find out more

Have a project in mind?
Contact us to see if we could be a good fit.
info@bakmanagement.com
Koppenstraße 93, 10243 Berlin
+49 (0)30 3989 3119