Case Study

Laim

Details

1 Floor

Landsberger Str. 161

 80687 München

Where we jumped in

We helped manage this project from the detailed design phase through to completion, with all defects resolved.

Challenges

This project was challenging as COVID caused delays in the supply chain and the basement store was in operation during the construction phase. By planning all phases in great detail and determining the best logistical routes.

Added Value

Our knowledge of Self-Storage, construction in Bavaria and the architects in-depth knowledge of conversion turned out to be a great fit. 

We were able to complete this project within budget and on time.

Client: Shurgard

Type: Self-Storage

Started: March 2021

Completed: December 2021

Project Type: Conversion

Role: Project Management

Mastered Challenges

  • COVID
  • construction during ongoing operations 
  • A tight timetable

Other Projects

INDUSTRIAL

Laim

For Shurgard Self-Storage

INDUSTRIAL

Berlin

For Shurgard Self Storage

RESIDENTIAL

Munich

For Ten Brinke Group

Contact us to find out more

Jan Bak

Founder & Managing Director

e: info@bakmanagement.com
t: +49 (0)30 3989 3119

Have a project in mind?

Contact us to see if we could be a good fit. 

info@bakmanagement.com
Koppenstraße 93, 10243 Berlin
+49 (0)30 3989 3119