Case Study
Laim
Details
1 Floor
Landsberger Str. 161
80687 München



Where we jumped in
We helped manage this project from the detailed design phase through to completion, with all defects resolved.
Challenges
This project was challenging as COVID caused delays in the supply chain and the basement store was in operation during the construction phase. By planning all phases in great detail and determining the best logistical routes.
Added Value
Our knowledge of Self-Storage, construction in Bavaria and the architects in-depth knowledge of conversion turned out to be a great fit.
We were able to complete this project within budget and on time.
Client: Shurgard
Type: Self-Storage
Started: March 2021
Completed: December 2021
Project Type: Conversion
Role: Project Management
Mastered Challenges
- COVID
- construction during ongoing operations
- A tight timetable
Other Projects
INDUSTRIAL
Laim
For Shurgard Self-Storage
INDUSTRIAL
Berlin
For Shurgard Self Storage
RESIDENTIAL
Munich
For Ten Brinke Group
Contact us to find out more

Have a project in mind?
Contact us to see if we could be a good fit.
info@bakmanagement.com
Koppenstraße 93, 10243 Berlin
+49 (0)30 3989 3119